3Ton Adjustable Aluminium Gantry Crane Exported to Dubai

In November 2025, MOTCRANE successfully completed 3 set of 3ton adjustable aluminium gantry crane exported to Dubai, United Arab Emirates. The inquiry was initiated by an engineer from major shipyard in Dubai, who required a flexible lifting solution for handling Siemens components during on-site operations.

The first person to send the inquiry was an engineer from a large shipyard in Dubai. He needed a solution for three sets of 3-ton adjustable aluminium gantry crane systems to lift Siemens products on site and also requested that all be delivered within 15 days.

Description

3Ton Adjustable Aluminium Gantry Crane Exported to Dubai

 

 

The customer mainly uses adjustable aluminum alloy gantry cranes to lift Siemens components, requiring a stable and flexible lifting structure that is convenient for transfer to other operation sites. The main requirements include:

(1) Lightweight aluminum alloy portal structure, convenient for transportation

(2) Adjustable height to adapt to different lifting heights

(3) Reliable load performance, suitable for workshop and shipyard environments

(4) Tight delivery time

Meeting these requirements while maintaining product quality and safety standards is the key to the project’s success.

 

I. MOTCRANE’s rapid response and drawing confirmation


 

Due to the urgency of the customer’s demand for cranes, the sales manager of MOTCRANE immediately shared a drawing of a 3-ton aluminum alloy gantry crane of the same type that was previously exported to Europe with the customer to confirm whether it could meet the usage requirements. This greatly shortened the time for the initial technical confirmation. At the same time, we provided the customer with a detailed quotation sheet. It clearly lists two logistics methods for customers to choose from:

(1) Sea freight: Low cost, approximately 600 US dollars, but the transportation time is relatively long.

(2) Air freight: The cost is about ten times that of sea freight, but the transportation time can be compressed to one week.

After careful consideration, the customer ultimately chose the air freight option and immediately arranged for the purchase order and the entry into the supplier system.

 

II. Pre-Shipment Documentation and On-Time Delivery to Dubai


 

After receiving the customer’s PO, in order to meet the customer’s eagerness to choose air freight, we activated the emergency production plan and significantly shortened the standard cycle. It only took 10 days from production to the completion of load testing! Before shipment, we conducted a comprehensive load test and inspection, and promptly sent the test process and photos of the completed packaging to the customer’s email for confirmation, ensuring that the customer is 100% at ease.

 

3Ton Adjustable Aluminium Gantry Crane Exported to Dubai

 

Before shipment, we have prepared the documents required for PO: proforma invoice, packing list, factory certificate of conformity and the crucial COC certification to ensure that the goods can be cleared quickly upon arrival in Dubai. Thanks to the efficient collaboration of the MOTCRANE team, all the goods successfully arrived at Dubai Airport (DXB) before Christmas in 2025, effectively ensuring the project progress of the client.

 

Adjustable Aluminium Gantry Crane

 

III. Why choose MOTCRANE?


 

MOTCRANE is committed to providing global customers with “fast, reliable and transparent” high-end lifting solutions. Whether it is standard cranes or non-standard customized cranes, MOTCRANE can ensure that the usage requirements of different customers are met by virtue of its profound technical accumulation, flexible production control system and professional international project execution ability.

 

For more adjustable aluminium gantry crane information or other gantry cranes, please contact us:

By email:sales@motcrane.com

By WhatsApp:+86 18752670256

Parameter

3Ton Adjustable Aluminium Gantry Crane Exported to Dubai

 

♦  Load Capacity:3ton

♦  Height:2581-3581mm

♦  Span:3920mm

♦  Working Class:M3

♦  Lifting speed:Manual control

♦  Hoist travelling speed:Manual control

♦  Control mode:Manual control

♦  Power Source:/

♦  Electric hoist color:Yellow

Download Specifications

Adjustable Aluminium Gantry Crane PG-3T DRAWING(cick to download) 2026-01-02

GET QUOTES

    ©Copyright 2025 By Jiangsu Morton Marine Technology CO.,LTD All Rights Reserved
    en_USEnglish